Where the external LWTS fails and the failure causes a spill beyond the work area, the R25(i) contingency plan must be put into action. The guideline notes that C67 sets a timeframe for reporting incidents to the Regulator.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.