Australia OGTR Guidelines for Certification of a PC2 Large Scale Facility (Version 3.1)
Part B: Conditions of certification – Australia OGTR Guidelines for Certification of a PC2 Large Scale Facility (Version 3.1)

Australia OGTR Guidelines for Certification of a PC2 Large Scale Facility (Version 3.1) C12: Authority to admit and exclude where the holder is not the owner

What does C12 require?

A holder that does not own the facility and lacks power to admit people to, or exclude them from, the premises must not allow dealings there until the owner has given that authority in writing. If the holder cannot stop dealings from happening, it must tell the Regulator in writing as soon as practicable.

Maintained by Gerard Blokdyk

Other controls in Part B: Conditions of certification – Australia OGTR Guidelines for Certification of a PC2 Large Scale Facility (Version 3.1)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.