The certification holder must keep the physical features of the facility and its fittings maintained so that the Part A facility and fittings requirements (R1 to R12), together with any exemptions or extra requirements set by the Regulator or a delegate, go on being met.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.