The certification holder must keep the physical features of the facility and fittings maintained so that the Part A LWTS requirements (R25), together with any exemptions or extra conditions or requirements set by the Regulator or a delegate, go on being met.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.