Where a risk management plan exists and flooding or a storm surge happens or is about to happen, the plan must be put into action, and the Regulator must be told as soon as practicable after it has been carried out.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.