Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)
Part C3: On-site wastewater management – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) C3P6: C3P6 Keep land application systems contained, vented and protected

On-site wastewater and land application systems must complete treatment, uptake and absorption of final effluent within the approved area, protect against internal contamination and provide ventilation against foul air build-up, and avoid odours and offensive matter, stormwater run-off entering the system, root or ground water ingress, unintended discharge, blockage and leakage, and damage from superimposed loads or ground movement.

Maintained by Gerard Blokdyk

Other controls in Part C3: On-site wastewater management – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.