On-site wastewater systems must minimise impacts on, and maintain and enhance, community amenity, with design and implementation contributing to the aesthetic values of individual and grouped properties. Where a system discharges to the point of connection of a Network Utility Operator's sewer, the connection must meet the operator's requirements.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.