Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)
Part B2: Heated water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B2P9-B2P10: B2P9 and B2P10 Provide heated water at suitable temperature and pressure

Heated water must be provided at temperatures that let fixtures and appliances work correctly, and points of discharge must have a working pressure of at least 50 kPa and a static pressure within the building of no more than 500 kPa, or suitable pressures where different figures are needed. Tasmania replaces B2P10 and exempts existing low-pressure gravity-only services. Deemed-to-Satisfy is AS/NZS 3500.4.

Maintained by Gerard Blokdyk

Other controls in Part B2: Heated water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.