Part B2: Heated water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B2P3: B2P3 Keep heated water velocity within limits

Velocity in heated water pipework up to 65 degrees Celsius must not exceed 3.0 metres per second for at least 99 per cent of peak hour demand in non-circulatory systems, 1.2 metres per second on the flow and 1.0 on the return of a copper circulatory service, and 2.0 on the flow and 1.0 on the return of a circulatory service in other materials. Explanatory information links high velocity to erosion and corrosion of pipework. Deemed-to-Satisfy is installation to AS/NZS 3500.4.

Maintained by Gerard Blokdyk

Other controls in Part B2: Heated water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.