Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)
Part B1: Cold water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B1P3-B1P4: B1P3 and B1P4 Provide access to, and isolation of, cold water components

Access must be provided to cold water service components that need maintenance or replacement, including mechanical devices and controls, and a means of isolation must be provided to the service and to components that need testing, maintenance or replacement. Access may need an access panel, cover or door to be removable, and isolation valves are the usual means. Deemed-to-Satisfy is installation to AS/NZS 3500.1.

Maintained by Gerard Blokdyk

Other controls in Part B1: Cold water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.