Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia) B1P2: B1P2 Keep cold water velocity within limits

Water velocity in cold water pipework must not exceed 3 metres per second for at least 99 per cent of the time water is needed during the peak hour, and velocity in valves and devices must allow fixtures and appliances to work correctly. Verification Method B1V1 sizes pipework for a Class 2 or 3 building against a minimum diameter worked out from design flow. Deemed-to-Satisfy is installation to AS/NZS 3500.1 (B1D3). The limit is an upper figure, so pipe and fitting makers' own velocity limits also need checking.

Maintained by Gerard Blokdyk

Other controls in Part B1: Cold water services – Australia National Construction Code 2025 Volume Three (Plumbing Code of Australia)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.