Before relying on a control, test it to confirm it is suitable for the workplace, works as intended and does not introduce new risks. Allow enough time for workers to adjust before judging effectiveness, check frequently with workers on how the changes are working and supervise to make sure controls are being applied effectively.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.