At the edge of the shower area, where a screen will be installed, the waterstop's vertical leg finishes at least 5 mm above finished floor level, and any joint in the waterstop or intersection with a wall must be waterproof.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.