IASC Reference Module for Cluster Coordination at Country Level (2015)

International
vRevised July 2015, endorsed by the IASC Principals
12 domains
198 controls

The IASC Reference Module for Cluster Coordination at Country Level: how humanitarian clusters should be activated, led, run, monitored and handed over, the six core cluster functions and what lead agencies, coordinators and partners each commit to.

Verified

IASC Reference Module for Cluster Coordination at Country Level (2015) is a compliance framework from International with 12 domains and 198 controls. The largest domains are Section 11: Cluster transition and de-activation – IASC Reference Module for Cluster Coordination at Country Level (2015) (43 controls), Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) (21 controls), Section 5: Cluster management arrangements and cluster lead agency responsibilities – IASC Reference Module for Cluster Coordination at Country Level (2015) (20 controls). Every control below carries what it requires and what an assessor expects to see.

Maintained by Gerard Blokdyk

Framework summaries on this platform are interpretations grounded in the published source, for educational and compliance planning purposes. They do not reproduce or replace the official standards. Refer to the authoritative source for the definitive text. Framework names and trademarks belong to their respective organisations.

Framework Domains (12)

Annexes: preparedness approach, roles compared and performance monitoring steps – IASC Reference Module for Cluster Coordination at Country Level (2015)

9 controls
Controls in the Annexes: preparedness approach, roles compared and performance monitoring steps – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 9 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-10Hazard identification and country risk profile
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-11Using risk analysis to trigger contingency planning
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-12Minimum readiness steps every HCT must deliver
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-13Advanced preparedness actions for a specific risk
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-14What the contingency plan contains and how it is kept current
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-20Planning a performance monitoring exercise
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-21How the cluster survey is run
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-22Cluster analysis and action planning workshop
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-AX-23Follow-up and quarterly reporting

Introduction and Section 1: Cluster and sector coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

17 controls
Controls in the Introduction and Section 1: Cluster and sector coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 17 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-04Accountability to affected people as the goal
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-05Keep clusters lean and results-focused
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-06HC and HCT decide on cluster activation
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-07Review cluster relevance every year
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-08Partners share leadership and joint work
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-09Dedicated, trained cluster coordinators
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-10Cluster meetings focus on strategy and results
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-11Hold meetings only when needed
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-12Strengthen inter-cluster coordination
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-13Prioritise information management and pooled resources
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-14International coordination supports national efforts
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-15Apply the cluster approach according to context
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-19Cluster accountability to HC and affected people
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-20Hand coordination to national authorities
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-22Base activation on needs and capacity analysis
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-24Co-lead clusters with Government and NGOs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S1-25Align with UNHCR refugee coordination

Section 10: Monitoring cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

8 controls
Controls in the Section 10: Monitoring cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 8 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-02Monitor clusters so structures stay fit for purpose
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-03Run a CCPM self-assessment on the core functions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-04Use CCPM to test whether functions support delivery
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-05Schedule CCPM at 3 to 6 months and then yearly
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-06Review cluster architecture on a fixed cycle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-07Run the review and choose one of four options
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-08Base fit-for-purpose decisions on context and national capacity
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S10-09OCHA helps reviews happen on time and tracks them

Section 11: Cluster transition and de-activation – IASC Reference Module for Cluster Coordination at Country Level (2015)

43 controls
Controls in the Section 11: Cluster transition and de-activation – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 43 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-02Deactivate once the gap closes
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-03Prepare a phased transition plan
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-04Review cluster need every year
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-05Review architecture where clusters are not activated
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-06Improved situation removes the original gap
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-07National structures can meet residual needs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-08HC leads transition and deactivation
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-09Partners help draft and agree plans
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-10Base decisions on national capacity
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-11Account for context and successor capacity
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-12Anchor transition in early recovery
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-13Define accountability when merging clusters
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-14Do not close a cluster for lack of funds
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-15Make accountability for core functions explicit
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-16Keep preparedness responsibilities during transition
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-17Be ready to fill critical gaps
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-18Review within three months and plan by day 90
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-19Review annually and before new planning cycles
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-20Report review results to the ERC each year
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-21OCHA coordinates timely architecture reviews
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-22Start transition strategy at response outset
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-23Take immediate transition steps early
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-24HC/HCT initiate the review with OCHA support
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-25Involve leads, partners and national counterparts
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-26Keep Global Clusters informed
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-27Apply the transition principles
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-28Set a review method that fits the emergency
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-29Plan handover and local capacity early
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-30ERC monitors reviews globally
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-31Map preparedness, response and coordination needs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-32Identify successor mechanisms for cluster functions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-33Assess successor capacity
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-34Decide the capacity building period
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-35Assess criteria for new clusters
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-36Define accountability and set benchmarks
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-37Set out when transition happens
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-38Propose a timetable for further reviews
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-39Decide how preparedness continues
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-40Global Clusters support and learn from reviews
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-41HCT records the chosen cluster option
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-42HC sends review summary to ERC and government
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-43ERC seeks IASC approval with ten days for comment
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S11-44HC informs partners after approval

Section 2: Cluster activation – IASC Reference Module for Cluster Coordination at Country Level (2015)

16 controls
Controls in the Section 2: Cluster activation – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 16 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-01Recommend clusters only for a clear gap
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-02Plan deactivation and transition early
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-03Build national capacity from the outset
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-04Response and coordination gap exists
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-05National capacity cannot meet needs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-06Map national coordination mechanisms
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-07Alert global cluster lead agencies
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-08Determine which clusters to recommend
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-09Select cluster lead agencies
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-10Write to the Emergency Relief Coordinator
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-11ERC transmits proposal within 24 hours
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-12ERC confirms endorsement or feedback
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-13Inform partners of approved clusters
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-14Professional coordination and information management
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-15Deploy IARRM staff within 72 hours
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S2-16Maintain rosters and report deployments

Section 3: The six core cluster functions, provider of last resort and accountability to affected people – IASC Reference Module for Cluster Coordination at Country Level (2015)

8 controls
Controls in the Section 3: The six core cluster functions, provider of last resort and accountability to affected people – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 8 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-01Support service delivery
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-02Inform strategic decision-making
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-03Plan and implement cluster strategies
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-04Monitor and evaluate performance
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-05Build national preparedness capacity
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-06Support robust advocacy
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-07Provider of last resort
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S3-08Accountability to affected people

Section 4: The role of clusters in preparedness – IASC Reference Module for Cluster Coordination at Country Level (2015)

18 controls
Controls in the Section 4: The role of clusters in preparedness – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 18 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-01RC/HC ensures the system is ready
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-02RC/HC tasks lead agencies on ERP
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-03Cooperate with and support national authorities
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-05Identify programme cycle work needed in advance
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-06Analyse and address anticipated risks
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-07Build relationships and respect national leadership
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-08Build relationships with critical partners
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-09Reinforce the coordination structures for response
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-10Clarify roles across the humanitarian community
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-12HCT and Global Clusters check ERP quality
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-13Lead agencies put ERP into practice
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-14Clusters contribute to all three ERP components
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-15Global Clusters track country ERP and readiness
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-16Sector mechanisms help apply the ERP approach
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-17Global Clusters back RC and sector mechanisms
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-18RC and sector leads promote preparedness
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-19Sector leads close minimum preparedness gaps
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S4-20Global Clusters assist only on request

Section 5: Cluster management arrangements and cluster lead agency responsibilities – IASC Reference Module for Cluster Coordination at Country Level (2015)

20 controls
Controls in the Section 5: Cluster management arrangements and cluster lead agency responsibilities – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 20 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-02A well-run cluster is a lead agency deliverable
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-03Clusters support national authorities in a response
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-04Track performance of the six core functions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-05Establish a cluster that adds coordination value
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-06Advocate resources and allocate by agreed priorities
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-07Integrate cross-cutting issues and protection
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-08Keep the cluster responsive to a changing context
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-09Transfer and use information well
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-10Contribute to inter-cluster forums and cooperate
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-11Equal participation and feedback for affected people
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-12Adapt cluster management to the situation
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-13Define participation and set up advisory groups
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-14Operational relevance in the emergency
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-15Technical expertise
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-16Capacity to contribute strategically
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-17Commitment to consistent contribution
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-18SAG shapes strategy and work plan
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-19SAG membership and two-way information flow
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-20National SAG decides on sub-national management
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S5-21Create task-focused technical working groups

Section 6: Sharing leadership – IASC Reference Module for Cluster Coordination at Country Level (2015)

10 controls
Controls in the Section 6: Sharing leadership – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 10 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-01Consider sharing leadership with NGOs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-03Terms of reference for shared leadership
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-04Retain cluster lead accountability
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-05Provider of last resort readiness
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-06Guide shared leadership terminology
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-07Take funding barriers out of shared leadership
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-08Qualified staff in shared roles
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-09Training for shared leadership
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-10Assess needs and capacities
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S6-11Build national capacity through sharing

Section 7: Minimum commitments for participation in clusters – IASC Reference Module for Cluster Coordination at Country Level (2015)

16 controls
Controls in the Section 7: Minimum commitments for participation in clusters – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 16 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-02Adapt commitments to the context
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-03Reciprocal responsibility of cluster leads
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-04Provide a forum for humanitarian action
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-05Shared responsibility for timely response
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-06Commit to principles and standards
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-07Mainstream protection in programmes
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-08Act on accountability to affected people
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-09Understand cluster membership duties
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-10Participate actively in the cluster
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-11Contribute to the response plan
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-12Mainstream cross-cutting issues
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-13Designate a senior cluster focal point
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-14Use resources cooperatively
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-15Take sub-national leadership roles
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-16Carry out advocacy
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S7-17Provide interpretation for participation

Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

21 controls
Controls in the Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 21 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-02HCT strategic direction
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-03Inter-sectoral analysis for HCT decisions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-04OCHA chairs the inter-cluster platform
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-05Two-way communication with clusters
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-06OCHA support and secretariat
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-07Agree strategic objective contributions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-08Support inter-cluster forums
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-09Involve all operational actors
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-10Assist humanitarian programme cycle delivery
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-11Facilitate strategic objective delivery
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-12Set up coordination at all levels
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-13Support protection mainstreaming
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-14Help clusters analyse differing needs
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-15Embed protection and accountability
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-16Report progress to HC/HCT
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-17Develop advocacy with clusters
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-18Monitor cluster coordination
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-19Define common standards and tools
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-20Link humanitarian and development coordination
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-21Provide information management support
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S8-22Facilitate pooled funding allocations

Section 9: Sub-national coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

12 controls
Controls in the Section 9: Sub-national coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) domain of IASC Reference Module for Cluster Coordination at Country Level (2015): 12 controls
CodeTitle
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-02Let sub-national structures decide and respond faster
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-03Use sub-national mechanisms for accountability and adaptation
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-04Include sub-national level in assessment and planning
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-05Formalise sub-national clusters in endorsed terms of reference
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-06Give sub-national clusters enough staff to coordinate and manage information
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-07Open sub-national leadership to partners and authorities
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-08Match capacity and seniority to the operational level
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-09Establish and deactivate sub-national clusters on need
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-10National clusters give support and policy direction
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-11Sequence national meetings after sub-national ones and record decisions
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-12Link both levels for coherence, trends and advocacy
iasc-reference-module-for-cluster-coordination-at-country-level-2015::CC-S9-13Support and shape sub-national inter-cluster coordination

What is IASC Reference Module for Cluster Coordination at Country Level (2015) and who does it apply to?

IASC Reference Module for Cluster Coordination at Country Level (2015) is a compliance framework from International with 12 domains and 198 controls. The IASC Reference Module for Cluster Coordination at Country Level: how humanitarian clusters should be activated, led, run, monitored and handed over, the six core cluster functions and what lead agencies, coordinators and partners each commit to. It is used by organisations to establish and maintain compliance with industry standards and regulatory requirements.

What does IASC Reference Module for Cluster Coordination at Country Level (2015) actually require?

IASC Reference Module for Cluster Coordination at Country Level (2015) has 198 controls organised across 12 domains. The largest domains are Section 11: Cluster transition and de-activation – IASC Reference Module for Cluster Coordination at Country Level (2015) (43 controls), Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015) (21 controls), Section 5: Cluster management arrangements and cluster lead agency responsibilities – IASC Reference Module for Cluster Coordination at Country Level (2015) (20 controls). Each control defines specific requirements that organisations must implement to achieve compliance.

If I already comply with another framework, how much of IASC Reference Module for Cluster Coordination at Country Level (2015) do I already cover?

IASC Reference Module for Cluster Coordination at Country Level (2015) does not currently have cross-framework mappings in our system. Check back as we continuously expand our mapping database.

How do I implement IASC Reference Module for Cluster Coordination at Country Level (2015)?

Start your IASC Reference Module for Cluster Coordination at Country Level (2015) compliance journey by running a self-assessment on our platform to identify your current compliance posture. Our AI advisory can answer specific questions about IASC Reference Module for Cluster Coordination at Country Level (2015) requirements, and cross-framework mapping helps you leverage existing controls from other frameworks you may already comply with. Create a free account to access all 198 controls and track your progress.

Start Your Compliance Journey

Create a free account to run self-assessments, get AI advisory, and track your compliance progress across 1,442 frameworks.

Get Started Free →

Free forever, no credit card required