IASC Reference Module for Cluster Coordination at Country Level (2015)
Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

IASC Reference Module for Cluster Coordination at Country Level (2015) CC-S8-15: Embed protection and accountability

What does CC-S8-15 require?

OCHA should support efforts to make protection, early recovery and accountability to affected people part of every stage of the humanitarian programme cycle.

Maintained by Gerard Blokdyk

Other controls in Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.