IASC Reference Module for Cluster Coordination at Country Level (2015)
Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

IASC Reference Module for Cluster Coordination at Country Level (2015) CC-S8-16: Report progress to HC/HCT

What does CC-S8-16 require?

OCHA should keep the HC/HCT informed of operational progress and of any issues that need their input, advocacy or other support.

Maintained by Gerard Blokdyk

Other controls in Section 8: Inter-cluster coordination – IASC Reference Module for Cluster Coordination at Country Level (2015)

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.