The program must identify the operational context of the asset; identify its material risks, including those specified in s 8; so far as reasonably practicable minimise or eliminate the material risks and mitigate the relevant impact of each hazard on the asset; include a mechanism for regular review under s 30AE; and include a mechanism for keeping the program current under s 30AF. In deciding whether a risk is material the entity must consider the likelihood of the hazard and its relevant impact (s 30AH(7)).