Unless particular reasons argue otherwise, the supervisory authority works with the operator before scanning to: assess the risk of disruption to operations; plan the execution so that load on the systems is minimised; prepare a plan for aborting the scan; and assess whether the ability to restore systems that might be adversely affected needs to be secured in advance.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.