Requirement 0208 (Part Six: Physical, section 25.6 Physical Security Measures and Controls; applies to All entities; dated 31 October 2024; retained from Release 2025): Unauthorised access to Security Zones One to Five is controlled in accordance with the physical security measures and controls for security alarm systems. Zone Three needs a hard-wired Type 1A or Class 5 alarm or random guard patrols within every four hours; Zones Four and Five need SCEC Type 1A with SL3 or SL4 detection designed by SCEC-endorsed consultants; entity-managed control, cleared operators, monitored response and one-way interoperability.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.