Protective Security Policy Framework (PSPF) Release 2026
Part Six: Physical (sections 23 to 25) – Protective Security Policy Framework (PSPF) Release 2026

Protective Security Policy Framework (PSPF) Release 2026 0190: Facility security plan for new, under-construction or refurbished facilities

What does 0190 require?

Requirement 0190 (Part Six: Physical, section 23.1.1 Physical Security Lifecycle; applies to All entities; dated 31 October 2024; retained from Release 2025): A facility security plan is developed for new facilities, facilities under construction or major refurbishments of existing facilities. Covers location, tenancy, collateral exposure, access, classification of information and technology handled, classified discussions, other resources, and measures for the site, specific areas, storage, meetings, business hours and out-of-hours.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • A.7.3 A.7.3 Design of controls and countermeasures (PPS design)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Part Six: Physical (sections 23 to 25) – Protective Security Policy Framework (PSPF) Release 2026

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.