NIST SP 800-53 Rev 5
PE - Physical and Environmental Protection

NIST SP 800-53 Rev 5 NIST800-PE-9: PE-9 Power Equipment and Cabling

What does NIST800-PE-9 require?

Protect power equipment and power cabling for the system from damage and destruction.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 16 controls across 12 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 27001:2022 · 2 controls

  • 7.11 Supporting utilities
  • 7.12 Cabling security

ISO 27002:2022 · 2 controls

  • 7.11 Supporting utilities
  • 7.12 Cabling security

SOC 2 · 2 controls

  • SOC2-A1.2 A1.2 Environmental protection, backup and recovery infrastructure
  • SOC2-CC6.4 CC6.4 Restricting physical access to facilities and assets

C5 (Germany) · 1 control

  • C5-PS-06 Protection against interruptions caused by power failures and other such risks
  • CFTC-SS-6 Physical Security and Environmental Controls Category

CMMC 2.0 · 1 control

FedRAMP High · 1 control

  • PE-9 Power Equipment and Cabling (PE-9)

FedRAMP Moderate · 1 control

  • PE-9 Power Equipment and Cabling (PE-9)
  • NIST-CSF-PR.IR-02 The organization's technology assets are protected from environmental threats
  • PE-9 PE-9 Power Equipment and Cabling
  • PE-9 PE-9 Power Equipment and Cabling

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in PE - Physical and Environmental Protection

You are reading one control. How much of NIST SP 800-53 Rev 5 have you already done?

NIST SP 800-53 Rev 5 NIST800-PE-9 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-53 Rev 5 your existing evidence covers. Hold ISO 27001:2022 and 163 of 1014 NIST SP 800-53 Rev 5 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 342 were rejected on the ISO 27001:2022 pair alone.

Query this from an agent

The graph holds this control, the 16 it maps to, and the evidence behind each claim, over MCP and REST.