NIST SP 800-218
Prepare the Organization

NIST SP 800-218 SP800-218-PO.1.2: Implement Security Requirements in the Toolchain

Configure development tools, source control, build systems, and artifact repositories to enforce the security requirements. Automate enforcement so that compliance is the default behavior rather than a manual checklist.

Maintained by Gerard BlokdykVerified against the published standard Control text last updated

What else in your programme already covers this

This control maps to 22 controls across 15 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • CCM-AIS-04 Secure Application Design and Development
  • CCM-AIS-05 Automated Application Security Testing
  • CCM-AIS-06 Automated Secure Application Deployment
  • ASBv3-DS-3 Secure DevOps infrastructure
  • DS-6 Enforce security of workload throughout DevOps lifecycle

ISO 27001:2022 · 2 controls

  • 8.25 Secure development life cycle
  • 8.9 Configuration management

ISO 27002:2022 · 2 controls

  • 8.31 Separation of development, test and production environments
  • 8.9 Configuration management

NIST SP 800-161 Rev 1 · 2 controls

NIST SP 800-53 Rev 5 · 2 controls

  • SEC11-BP02 Automate testing throughout the development and release lifecycle

C5 (Germany) · 1 control

CIS Controls v8 · 1 control

  • CIS-16.12 Implement Code-Level Security Checks

CMMC 2.0 · 1 control

FedRAMP High · 1 control

  • SA-15 Development Process, Standards, and Tools (SA-15)

FedRAMP Moderate · 1 control

  • SA-15 Development Process, Standards, and Tools (SA-15)

NIST SP 800-172 · 1 control

  • 3.4.2e Automated Detection and Remediation of Unauthorized Software

SOC 2 · 1 control

  • SOC2-CC5.2 CC5.2 General controls over technology (COSO principle 11)

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Prepare the Organization

You are reading one control. How much of NIST SP 800-218 have you already done?

NIST SP 800-218 SP800-218-PO.1.2 is one control. If you already hold one of the frameworks below, a reviewed crosswalk already says how much of NIST SP 800-218 your existing evidence covers. Hold NIST SP 800-53 Rev 5 and 30 of 42 NIST SP 800-218 controls already carry evidence.

Each report names every control your existing framework evidences, every one it does not, the reasoning behind each claim, and the claims that were argued against and rejected. 0 were rejected on the NIST SP 800-53 Rev 5 pair alone.

Query this from an agent

The graph holds this control, the 22 it maps to, and the evidence behind each claim, over MCP and REST.