Power infrastructure carries at least N+1 redundancy across every critical component (UPS, power distribution units, backup generators), and the facility's power usage effectiveness (PUE) is reported to NITDA annually against the target range of 1.6 to 3.6 or lower.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.