Every emergency system overcurrent device must coordinate selectively with the protective devices both upstream and downstream of it, the selection made by a licensed professional engineer or another qualified person working mainly in electrical design, installation or maintenance, documented and made available to everyone responsible for designing, installing, inspecting, maintaining or operating the system. Replaced devices are reevaluated, and coordination is reevaluated after any modification, addition or deletion; two devices in series with no load in parallel on the downstream one are excepted.
This control maps to 2 controls across 2 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.