Overcurrent devices of legally required standby systems must coordinate selectively with every protective device upstream and downstream, chosen by a licensed professional engineer or another qualified person engaged mainly in electrical design, installation or maintenance, with the selection documented and available to everyone responsible for designing, installing, inspecting, maintaining or operating the system. Replaced devices and any modification, addition or deletion trigger a reevaluation; two series devices with no parallel load on the downstream one are excepted.