NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management
Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management 5.4.3: 5.4.3 Procedures to locate, acquire, store, distribute, maintain, test and account for procured or donated resources

The entity is required to set procedures for finding, obtaining, storing, distributing, maintaining and testing, and keeping account of, the services, people, equipment and materials bought or donated in support of the program.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 2 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • 262.253 § 262.253 Testing and maintenance of equipment
  • 264.33 § 264.33 Testing and maintenance of equipment

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

Query this from an agent

The graph holds this control, the 2 it maps to, and the evidence behind each claim, over MCP and REST.