NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management
Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management 5.3.4: Gaps between RTOs, RPOs and demonstrated capabilities identified

What does 5.3.4 require?

The BIA must identify the gaps between the recovery time and recovery point objectives and the entity's demonstrated capabilities.

Maintained by Gerard BlokdykControl text last updated

Other controls in Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.