NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management
Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management 5.3.3: 5.3.3 The recovery point objective identified

The BIA is required to establish how much loss of data from paper and electronic records is acceptable, which is the recovery point objective.

Maintained by Gerard BlokdykControl text last updated

Other controls in Chapter 5: Planning (NFPA 1660-2024, NFPA 1600 content) – NFPA 1600 - Standard on Continuity, Emergency, and Crisis Management

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.