1 to 2 points; applies to all eight BD+C adaptations. Design for demand response: enrol in an existing programme for at least 10% of on-peak demand with automated capability, a plan and a full test (2 points); or be demand-response capable with interval meters, external-signal equipment and a 10% shed plan (1 point); and/or implement load flexibility (peak load optimisation or thermal or electric storage cutting on-peak load by 10%) after reviewing the building load shape against the regional grid profile; include demand response in commissioning and the systems manual. On-site generation does not count.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.