2 to 6 points; applies to all eight BD+C adaptations. Option 1 (3 points): the commissioning authority also reviews submittals, verifies systems manual and training requirements and delivery, verifies seasonal testing, reviews operations 10 months after substantial completion and writes an ongoing commissioning plan; monitoring-based commissioning adds a point with measured points, limits, analysis frequency (at least quarterly in year one) and corrective action planning. Option 2 (2 points): commission the building enclosure to ASHRAE Guideline 0 and ASTM E2947-16. Data centers add design verification reviews scaled to cooling load.