Manual or automated procedures for generating, collecting, analysing and reporting measurement data are integrated into the requirements processes; data are collected, stored and verified, analysed into information items, and the results recorded and given to the measurement users. Measures with data readily available across the life cycle are preferred, and the analysed requirements measures are reviewed together for predictive trends that aid risk management. Requirements measurement runs under the organization's own measurement process.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.