Change requests, variance requests and the approved changes to each baseline are tracked to closure. As the operational concepts and the stakeholder, system, software and element requirements change, the changes are captured formally in documented baselines with configuration information identifying each change and its rationale, and requirements traceability is maintained. Requirements are configuration managed in line with the project's and organization's configuration management processes.