ISO/IEC/IEEE 29148:2018 - Systems and Software Engineering - Requirements Engineering 6.5.3.2: 6.5.3.2 Requirements activities in preparing for validation

The project sets what validation will cover and the actions that go with it; for software that means naming the characteristics of the system, element or artifact under validation and the results expected. When the system of interest is itself one element within a bigger system, that bigger system's operational concept and its baselined stakeholder requirements are part of what validation covers.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

  • VAL.1.BP1 VAL.1.BP1 Specify validation measures for the product validation

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 6: Requirements processes – ISO/IEC/IEEE 29148:2018 - Systems and Software Engineering - Requirements Engineering

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.