ISO/IEC 27031:2011
Implementation and operation – ISO/IEC 27031:2011

ISO/IEC 27031:2011 7.6.2: Control of IRBC documentation

IRBC documentation, including policy, plans and procedures, should be controlled: approved before issue, reviewed and updated, versioned, and available where it is needed with obsolete versions withdrawn.

Maintained by Gerard BlokdykControl text last updated

Other controls in Implementation and operation – ISO/IEC 27031:2011

Query this from an agent

The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.