ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection
Clause 7: Process requirements (methods, items, records, reports, complaints and appeals) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection 7.6.4: Decision by persons not involved in the original inspection

What does 7.6.4 require?

Whoever decides the outcome sent to the complainant or appellant had no part in the inspection work being challenged, or that person's decision is reviewed and signed off by someone with no such involvement.

Maintained by Gerard Blokdyk

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in Clause 7: Process requirements (methods, items, records, reports, complaints and appeals) – ISO/IEC 17020:2012 Requirements for the operation of various types of bodies performing inspection

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.