Through its control of contracts and work orders the body makes sure that work is within its expertise with adequate resources, that the client's requirements and special conditions are adequately defined so unambiguous instructions can be issued, that ongoing work is kept under control through regular review and correction, and that the contract or work order requirements have been met.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.