Non-standard methods or procedures (anything not published by standards bodies, reputable technical organisations, groups of inspection bodies or scientific literature, including the body's own or the client's) are appropriate and fully documented.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.