Every inspection report or certificate includes identification of the issuing body, a unique identification and date of issue, the inspection dates, identification of the items inspected, signature or other approval indication by authorised personnel, a statement of conformity where applicable, and the results unless they are detailed under 7.4.3. Annex B lists optional elements.
This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.
Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.
The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.