This clause deals with the value assessment rules through which an inspection plan turns measured indicator values into the converted values the maturity model expresses; 7.1 makes them the second component of every plan and 7.6 gives their form, C = f(M). See the official text for the full requirement.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.