How to carry out process measurement with an inspection plan and inspection order (the activities A1 to A4 of the model in Figures 7 to 11 that clause 6 refers to; Annex D works an example based on ISO/IEC 33020). Only the title is held, from the contents page.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.