An inspection plan is made of one or more measurement stacks (7.2) and the rules that turn measured indicator values into converted ones (7.9). How converted values are expressed is up to the chosen maturity model, which gives the assessment a shared scale on which results can be compared.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.