Each instantiated stack underpins one measurement in its inspection plan, and pieces of one stack can also belong to other stacks. So a plan covering several processes can hold several stacks that reuse the same indicators and metrics (Figure 5 shows such a plan).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.