Turn strategy, policy and standards into implementation plans that give, for each planned control or improvement, the activities, resources, responsible people, timetable and measures, the plans 6.1 says Implementation draws up to satisfy the requirements. ISO 8000-62 assigns it to maturity Level 3 (Established).
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.