Verification is executed per the specification, the results evaluated against the expected results and criteria, deviations and anomalies analysed, and the verification report produced. This sits in clause 9, whose stated aim, per the SGS quotation, is that every work product meets the requirements set for it. Requirement text not held.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.