Verification is planned for each phase and sub-phase: the work products to be verified, the objectives, the methods and their ASIL-dependent selection, the pass and fail criteria, the environment and tools, the actions on anomalies and the regression strategy. This sits in clause 9, whose stated aim, per the SGS quotation, is that every work product meets the requirements set for it. Requirement text not held.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.