Accepted changes are implemented, the affected work products updated and verified, the confirmation measures repeated as needed and the change documented with its effect on the safety case. This sits in clause 8, whose stated aim, per the SGS quotation, is that every change to safety-related work products, items or elements is analysed and kept under control over the whole lifecycle. Requirement text not held.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.