Change management is planned and initiated before the start of development of the item or element so that every change to a safety-related work product after its baseline is analysed, controlled and documented. This sits in clause 8, whose stated aim, per the SGS quotation, is that every change to safety-related work products, items or elements is analysed and kept under control over the whole lifecycle. Requirement text not held.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.