ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 1:6.3.4: 6.3.4 Information is drawn from the whole delivery team

What does 1:6.3.4 require?

The information handed over at an exchange is gathered from the wider delivery team. Each lead appointed party may pass on some or all of the requirements it received and add its own, with its part in meeting the AIR or EIR set out in the delivery plans. Information is gathered from the delivery team and handed over with checking and, if needed, resubmission, and the delivery plan is updated to confirm what each new party contributes when it joins.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 9001:2015 · 1 control

  • 8.4.3 Information for external providers

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.