ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)
ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM) 1:5.6: 5.6 Asset information model (AIM)

What does 1:5.6 require?

The AIM supports the appointing party's asset management, both strategic and routine, and can supply information when project delivery begins. It may hold registers of equipment, running totals of maintenance cost, dates of installation and maintenance, property ownership, and anything else the appointing party judges worth managing systematically.

Maintained by Gerard BlokdykControl text last updated

What else in your programme already covers this

This control maps to 1 controls across 1 other frameworks. If you already hold one of them, the evidence you collected for it is the starting point here rather than new work.

ISO 55001:2024 · 1 control

  • 7.6 Data and information

Every mapping shown was judged rather than inferred from wording similarity, and the ones that failed review are published too. See the coverage reports and what was rejected.

Other controls in ISO 19650-1:2018 concepts and principles – ISO 19650 - Organisation and Digitisation of Information about Buildings and Civil Engineering Works (BIM)

Query this from an agent

The graph holds this control, the 1 it maps to, and the evidence behind each claim, over MCP and REST.