The verifier or validator shall confirm the type of engagement, its objectives (verification or validation), its scope (boundary, period) and its criteria (materiality, level of assurance and the rest) before the engagement; agreed-upon procedures (Annex C) are a further engagement type.
The graph holds this control, the 0 it maps to, and the evidence behind each claim, over MCP and REST.